Construction Process Sequence from Start to Finish

Building a house or commercial building is not just about the materials used, but also how each stage is carried out systematically. The construction process has an important work sequence to follow so that the final result is strong, neat, and meets standards. The following are the stages of construction from start to finish (finishing).

1. Planning & Licensing
Before construction begins, the first step is to make an architectural and structural design plan, determine the budget, and take care of building permits. This process also includes land surveys and consultations with experts such as architects and civil engineers.

2. Preparation Work
This stage includes land clearing, soil preparation, bowplank installation, and building boundary markers. This preparation is important so that the building size is precise and the next process can run smoothly.

3. Foundation Work
The foundation is a vital element supporting the building. The type of foundation used—either a shallow foundation such as river stones, or a deep foundation such as piles—is adjusted to the soil conditions and building load.

4. Structural Work
Includes the construction of sloofs, columns, beams, and floor slabs (slabs). At this stage, materials such as reinforced concrete, wire mesh, and bondek are used to strengthen the structure. The concrete casting process is carried out with the right quality and care so that the structure is sturdy.

5. Wall Work
After the structure is standing, the construction of walls is carried out using materials such as red brick, batako, or lightweight brick. This stage includes plastering and cementing so that the wall surface is ready for painting.

6. Roof Work
The roof structure is formed from a frame—usually light steel or wood—then covered using tiles, corrugated iron, or metal roofing. Make sure the roof has a sufficient slope for effective water flow and gutters.

7. Installation Work
Includes electrical installations, clean water, dirty water, and drainage systems. All installations are carried out before the final coating so as not to damage the finished walls or floors.

8. Finishing Work
Including painting, installation of ceramic or vinyl floors, ceilings, doors, windows, and other interior equipment. This stage determines the final aesthetics of the building and the comfort of the occupants.

Quality Construction Materials? Trust Us
PT Intisumber Bajasakti provides various types of high-quality building materials ranging from reinforced concrete, plates, wire mesh, zinc, mortar, to piles. With the support of technical services and large warehouses in various strategic locations, we are ready to support your construction project from start to finish.

πŸ“ž Contact us at +6221 66675999
🌐 Visit www.intisumberbajasakti.com for product and service information.

Back to List