How Long Does It Ideally Take to Build a House? Here's the Answer

Building a house is a big process that requires careful planning, both in terms of design, budget, and implementation time. One question that often arises is: how long does it ideally take to build a house?

The answer to this question can vary depending on several factors, ranging from the size of the house, the complexity of the design, land conditions, to the availability of labor and materials. However, this article will provide an overview of the time needed so that you can estimate the duration of the project more realistically.

General Stages of House Construction
Before discussing the duration, let's look at the stages of house construction in general:

Planning and Design:

  • Time: ± 2–4 weeks
  • Including consultation with an architect, design creation, calculation of RAB, and processing of permits.

Initial Work (Land and Foundation Preparation):

  • Time: ± 2–3 weeks
  • Including land clearing, foundation excavation, and initial casting.

Building Structure (Walls, Columns, Roof):

  • Time: ± 6–10 weeks
  • The core stages of construction from the frame to the roof covering.

Mechanical, Electrical, and Plumbing (MEP) Work:

  • Time: ± 2–4 weeks
  • Installation of electrical, clean water, and sanitation installations.

Finishing Work (Plaster, Paint, Ceramics, etc.):

  • Time: ± 4–6 weeks
  • Final stage so that the house is ready to be occupied and looks neat.

Cleaning and Handover:

  • Time: ± 1 week

Estimated Total Duration
For a 1-story house with a standard size (around 36–72 m²), the ideal construction time is between 3 to 5 months. Meanwhile, for a 2-story house or with a special design, the process can take 6 to 12 months.

Factors Affecting Construction Duration
Several things that can speed up or slow down construction time include:

  • Weather: Prolonged rain can disrupt structural work.
  • Material Availability: Choosing materials that are easily available will speed up the process.
  • Workforce: A professional and organized team can work more efficiently.
  • Design Changes During Construction: Design revisions midway can add time and cost.
  • Permits and Legality: Unfinished permits can hinder a project.

Use Quality Materials for Time Efficiency
One way to speed up construction without sacrificing quality is to use SNI standard construction materials that are fully available.

PT Intisumber Bajasakti is ready to meet your project needs with a variety of superior products such as:
✅ SNI reinforced concrete
✅ Wiremesh
✅ Practical columns
✅ Bondek
✅ Nails and other construction equipment

📞 Contact us at +6221 66675999
🌐 Visit www.intisumberbajasakti.com

Build your dream home more efficiently and with quality with a trusted construction partner!